Item Description
Steps taken in the last month
  • Continued water recovery from the live trench.
  • Operated shallow bell holes in area of concern for elevated chloride results
  • Completed water sampling to monitor chlorides
  • Dismantled and completed confirmatory sampling on final waste storage cell
  • Completed site clean-up and mat removal
  • Completed contaminated mat haul
  • Began preparation for replacement of pilot plant pond liner
Steps anticipated to be taken in the next month
  • Pilot Plant Pond liner replacement
  • Work with the AER to determine next steps in relation to site monitoring requirements.

Return to previous page