Item Description
Steps taken in the last 24 hours
  • Commenced activities to safely remove emulsion from the pipeline
  • To ensure safety of personnel, environmental work activities were restricted during pipeline related activities, so only priority environmental activities occurred
  • Continued wildlife monitoring
  • Note one wood frog and one boreal chorus frog are deceased as a result of the spill
  • Closed pitfall traps and set up gates to keep wildlife out during periods of low activity onsite
  • Fluid recovery of north and south bell holes and recovery trench after pipeline activities concluded
  • Continued priority field screening for electrical conductivity, chlorides, and visual sheen
  • Maintenance of wildlife fencing and deterrents
  • Continued priority water sampling of Unnamed Lake and surrounding area
  • Continued aquatic assessments of the Unnamed Lake
  • Collected priority subsurface water samples from drive point wells already installed
  • Commenced activities to safely remove emulsion from the pipeline
Steps to be taken in the next 24 hours
  • Continue activities to safely remove emulsion from the pipeline
  • To ensure safety of personnel, environmental work activities will be restricted during pipeline related activities, so only priority environmental activities will occur
  • Continue wildlife monitoring
  • Continue fluid recovery of bell holes and recovery trench after pipeline activities conclude
  • Continue priority field screening for electrical conductivity, chlorides, and visual sheen, surface water sampling, and subsurface water sampling
  • Continue priority water sampling of Unnamed Lake and surrounding area