Item Description
Steps taken in the last 24 hours
  • Continued activities to facilitate site access and limit impacts
  • Continued wildlife monitoring
  • Continued to monitor pitfall traps for amphibians
  • Continued fluid recovery of north and south bell holes and recovery trench
  • Continued field screening for electrical conductivity, chlorides, and visual sheen
  • Maintenance of wildlife fencing and deterrents
  • Continued water sampling of Unnamed Lake and surrounding area
  • Continued aquatic assessments of the Unnamed Lake
  • Continued installation of drive point wells based on previous data interpretation and collected soils samples from well locations
  • Collected subsurface water samples from drive point wells already installed
  • Working with the AER to prepare the pipeline for the safe removal of emulsion from the pipeline
Steps to be taken in the next 24 hours
  • Continue activities to facilitate site access
  • Continue aquatic assessments of Unnamed Lake
  • Continue installation of drive point wells based on previous data interpretation and collection of soil samples at the well locations
  • Continue wildlife monitoring
  • Continue fluid recovery of north and south bell holes
  • Continue field screening for electrical conductivity, chlorides, and visual sheen
  • Continue water sampling of Unnamed Lake and surrounding area
  • Continue wildlife fencing around perimeter of impacted area
  • Working with the AER to prepare the pipeline for the safe removal of emulsion from the pipeline


Return to previous page