Item Description
Steps taken in the last 24 hours
  • Continue activities to facilitate site access and limit impacts
  • Continue wildlife monitoring
  • Continue fluid recovery of north and south bell holes
  • Field screening for electrical conductivity, chlorides, and visual sheen
  • Maintenance of wildlife fencing and deterrents
  • Continue water sampling of Unnamed Lake and surrounding area
  • Continue aquatic assessments of the Unnamed Lake
  • Nesting surveys conducted in the surrounding area
  • Began installation of drive point wells based on previous data interpretation and collected soils samples from well locations
  • Continued installation safety signage along access road, work zones and staging area's
  • Continue work to expose pipeline for further inspections
  • Working with the AER on a plan to remove any emulsion from the pipe
Steps to be taken in the next 24 hours
  • Continue activities to facilitate site access, adding access to the south of the failure point
  • Continue aquatic assessments of Unnamed Lake
  • Continue installation of drive point wells based on previous data interpretation and collection of soil samples at the well locations
  • Continue wildlife monitoring
  • Continue fluid recovery of north and south bell holes
  • Continue field screening for electrical conductivity, chlorides, and visual sheen
  • Continue water sampling of Unnamed lake and surrounding area
  • Continue wildlife fencing around perimeter of impacted area
  • Continue work to expose pipeline for further inspections
  • Working with the AER on a plan to remove any emulsion from the pipe


Return to previous page