Item Description
Steps taken in the last 24 hours
  • Continue activities to facilitate site access and limit impacts
  • Continue wildlife monitoring
  • Continue fluid recovery of north and south bell holes
  • Field screening for electrical conductivity, chlorides, and visual sheen
  • Maintenance of wildlife fencing
  • Continue installation of wildlife visual deterrents (effigies, tape, pennant flagging)
  • Continue water sampling of Unnamed Lake and surrounding area
  • Began aquatic assessments of the Unnamed Lake
  • Install safety signage along access road, work zones and staging area's
  • Continue work to expose pipeline for further inspections
  • Working with the AER on a plan to remove any emulsion from the pipe
  • Revised locations for drive point wells based on incoming data
  • Submitted Comprehensive Plan to the AER
Steps to be taken in the next 24 hours
  • Continue activities to facilitate site access, adding access to the south of the failure point
  • Nesting surveys to be conducted in the surrounding area
  • Continue aquatic assessments of Unnamed Lake
  • Continue wildlife monitoring
  • Continue fluid recovery of north and south bell holes
  • Continue field screening for electrical conductivity, chlorides, and visual sheen
  • Continue water sampling of unnamed lake and surrounding area
  • Continue wildlife fencing around perimeter of impacted area
  • Continue work to expose pipeline for further inspections
  • Based on previous data interpretation, install drive point wells in highest risk areas, including the north end of the impacted area
  • Working with the AER on a plan to remove any emulsion from the pipe