Item Description
Steps taken in the last month
  • Completed a post fire assessment for damage cause by the wildfire in the region
  • Completed an initial; soil and vegetation assessment to determine impacts from the fire
  • Completed post fire assessment on water monitoring locations, completed required repairs and obtained samples for analysis
  • Began water recovery from the live trench in response to the elevated chloride results from the post fire water monitoring assessment
  • Clean up and finishing work of peat stockpiles used as supply for backfill
Steps anticipated to be taken in the next month
  • Continue water recovery from the live trench in response to the elevated chloride results from the post fire water monitoring assessment.
  • Reinstate shallow bell holes in area of concern for elevated chloride results
  • Complete water sampling to monitor elevated chlorides
  • Continue with site clean-up activities, mat picking
  • Resume waste haul to landfill of remaining contaminated material
  • Complete confirmatory sampling and dismantle waste storage cells
  • Resume contaminate mat haul to landfill
  • Plan for pilot plant pond liner replacement
  • De-mob of office trailers and other equipment


 