Item Description
Steps taken in the last 24 hours
  • Emulsion recovery from pipeline completed
  • Continued wildlife monitoring, including pit fall traps
  • One wood frog deceased as result of the spill
  • Fluid recovery of bell holes and recovery trench on going
  • Continued field screening for EC, chlorides, and visual sheen
  • Maintenance of wildlife fencing and deterrents
  • Continue to move visual deterrents to prevent habituation
  • Continued priority water sampling of Unnamed Lake and surrounding area
  • Collected subsurface water samples from all drive point wells
  • Field trials for waste management options
Steps anticipated to be taken in the next 72 hours
  • Continue wildlife monitoring, including pit fall traps
  • Continue to move visual deterrents to prevent habituation
  • Continue fluid recovery of bell holes and recovery trench
  • Continue priority field screening for EC, chlorides, and visual sheen, surface water sampling, subsurface water sampling, and soil sampling
  • Continue priority water sampling of Unnamed Lake and surrounding area
  • Continue field trials to confirm waste management and remediation plans
  • Continue subsurface water samples from all drive point wells
  • Install berm containment adjacent to the southwest bellhole
  • Conduct some water depth measurements on the lake and water quality sampling on northeast lake.
  • Evaluating chloride recovery methods on west of release area and east of Unnamed Lake
  • Evaluate containment south and south east of release using aqua dams and soil


Return to previous page