Item Description
Steps taken in the last 24 hours
  • Continued wildlife monitoring
  • Monitored pit fall traps
  • One wood frog deceased as result of the spill
  • Fluid recovery of bell holes and recovery trench
  • Recovery trench excavation
  • Continued field screening for EC, chlorides, and visual sheen
  • Maintenance of wildlife fencing and deterrents
  • Continued priority water sampling of Unnamed Lake and surrounding area
  • Completed installation of initial 36 drive point well network
  • Collected subsurface water samples from all drive point wells
  • Collected soil samples
Steps to be taken in the next 24 hours
  • Continue wildlife monitoring
  • Continue fluid recovery of bell holes and recovery trench after pipeline activities conclude
  • Continue priority field screening for EC, chlorides, and visual sheen, surface water sampling, subsurface water sampling, and soil sampling
  • Continue priority water sampling of Unnamed Lake and surrounding area
  • Conduct field tests to inform waste management and remediation plans


Return to previous page