Item Description
Steps taken in the last month
  • Continued water recovery from the live trench in response to the elevated chloride results from the post fire water monitoring assessment
  • Reinstated shallow bell holes in area of concern for elevated chloride results
  • Completed water sampling to monitor elevated chlorides
  • De-mob of office trailers and other equipment
  • Dismantled and completed confirmatory sampling on waste storage cells
  • Waste haul to landfill of remaining contaminated material from waste storage cells
Steps anticipated to be taken in the next month
  • Continue water recovery from the live trench as required
  • Continue with site clean-up activities and mat picking
  • Continue contaminate mat haul to landfill
  • Continue backfilling specific locations; south and north bulkhead
  • Dismantle additional waste storage cell once matting has been removed and complete confirmatory sampling
  • Pilot Plant Pond liner replacement